Service 08 of 10

Infrastructure Works

The buried network that ties the plant to the district — pre-insulated chilled-water pipelines, power distribution and energy transfer stations at every building.

Infrastructure Works
24 kmnetwork · Palm Jumeirah
8,000 mCHW network + ETS · Dubai Parks
1,000 mpre-insulated header · ADNEC
ETSat every development parcel
Scope

What ADC delivers

ADC designs and builds the distribution side of district cooling: pre-insulated underground chilled-water pipelines, power distribution and the energy transfer stations that hand cooling over to each development parcel.

References include 8,000 m of secondary chilled-water network with ETS for Dubai Parks & Resorts, over 1,000 m of pre-insulated main header at ADNEC, 950 m at NYU Saadiyat and a 350 m deep network at Lusail Marina, and the 24 km network serving Palm Jumeirah.

  • Pre-insulated CHW pipelines
  • Energy transfer stations (ETS)
  • Power distribution networks
  • Network hydraulic modelling (EPANET)
  • Deep and micro-tunnelled crossings
  • Metering & network SCADA
Palm Jumeirah — 24 km chilled-water networkPalm Jumeirah — 24 km chilled-water network
References

Projects delivered with Infrastructure Works.

One partner from first concept to final handover.

Engage · Partner · Conclude — send us the scope and our engineering team responds within one week.