Scope of Work

ADC was awarded an EPC contract to design & build 37,500 TR District Cooling Plant. A Thermal Energy Storage tank was included where it is providing 30,000 storage capacity.  

 ADC, through its engineering team generated the optimum design and equipment selection.

TECHNICAL DETAILS
Capacity Design to house 37,500 TR.
Temperatures 4.5 / 13.4 oC
Major Equipment

Trane Duplex Chillers
Hamon Cooling Towers
Arison-Gulf / Flowserve Pumps
TAMCO Switchgear, Schneider LV Siwtchgear and TESAR Transformers
Trane Chiller Managerment Controls

Electrical Characteristics 11 kV Feeders
Date Start July 2007